Repairs Being Made On Great Channel Bridge

Underdeck steel repairs are continuing this week on the Great Channel Bridge that connects Middle Township to Stone Harbor. According to the Cape May County Herald, one-way alternative traffic is in place for the next four weeks. Traffic in both directions is maintained, however, only one-way alternating traffic is being permitted to cross the bridge. Traffic approaching each side of the bridge will be maintained by a temporary traffic signal which will allow one direction of travel to proceed at a time. Motorists are urged to use caution when approaching and crossing the bridge and to not proceed until the signal is in the green phase. Slight delays should be expected.