The Mays Landing branch of the Atlantic County Library System, located at 40 Farragut Avenue, will be closed temporarily as of Monday, August 26 for the installation of a new $2.68 million HVAC system and generator. The library branch is expected to reopen in January 2025. Pre-construction mobilization will begin as of August 5. As a result, the four electric vehicle charging stations in the library parking lot will not be available August 5 through September 3, but will then be available throughout the duration of the project.